Lap roof underlay over metal welt.
Pitched roof gutter detail.
The brackets are fastened to the wood fascia by two brass screws.
On this page you can find the pdf instructions for installation of a typical box gutter detail with the dryseal flat roofing system.
Construction sloping roof using mixer truck latest technologies building sloping concrete roof duration.
Also some timber frame details.
The plan roof area should be multiplied by this factor.
Jan 19 2017 explore 柏均 林 s board gutter detail on pinterest.
Copper braces at the midpoints between the brackets.
Cover metal gutter lining up overthe tilt batten and extend under the eave course by minimum 150 to 200mm.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
A continuous copper apron strip extends onto the roof a maximum of 4.
An over fascia ventilation strip could be.
See more ideas about roof detail architecture details gutter.
Here are some new building regs drawings including mansard roof edge parapet wall box gutter verge detail pitched roof flat roof abutment threshold welted drip for external gutter pitched roof to wall junction pipe through wall joist hangers window frame window lintel window sill manholes soakaway etc.
Mixers construction 1 487 516 views.
Box gutter eaves fix continuous timber tilt batten at eaves to provide support for metal flashing and eaves course of tiles.
Pitched roofs 7 2 7 2 21 valleys and hidden gutters valleys shall have suitable weathering details including flashings to resist the passage of moisture to the inside of the building.
The gutter is secured to the wood fascia with cleats at the top edge and is supported by brackets spaced at 30.
When a roof is pitched its plan area is less than its true area.