Our vent pipe is located about 15 inches from the chimney.
Pipe against roof distance between.
Tim l thank you for your question.
Spacing half od of a flange which is larger between two pipes half od of other pipe insulation thickness of both pipes 25 mm or 1 inch.
Typical formula for spacing is as follows.
Such boot assembly is just not going to work well two inches from a chimney.
Consider the maximum distances from 2 cases.
To arrive at spacing between two pipes of different flange ratings refer to tables of both pipes and use the larger of the two distances.
Spacing between pipes on a pipe rack larger spacing may be required if pipes have clamped supports.
For 100 nb pipe and 150 nb 150 flange rating spacing 230 mm.
Two feet or 24 is a code interpretation for distance between plumbing vent stack rooftop termination and the top of a chimney that is less than 3 ft.
It is applicable to straight run pipe length only when a change of direction in a horizontal plane occurs it is suggested that the spacing be limited to times the standard pipe span.
A typical roof vent pipe is equipped with a sealing boot affixed to a flashing plate that is normally about 12 wide and about 16 dimension in the roof slope direction.
And for gas service 17 ft for 2 to 40 ft for 8.
To operate properly and safely each drain must be served by a vent line that carries sewer gases out through the roof.
To determine spacing between 150 nb pipe 150 flange rating and a 100 nb pipe with 600 flange rating.
Sinks lavatories bathtubs and laundry tubs may be served by 1 1 4 to 2 inch pipes.
Always maintain the distance between supports as per project specification recommended support span table.
Though some old homes may have pipes made of lead most drain piping is abs plastic cast iron or copper.
All open vent pipes that extend through a roof shall be terminated at least number typically 6 inches mm above the roof except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.
The roof or a wall the minimum distance must be 100 cm.
A length double the pipe diameter is considered appropriate for the part pointing downward.
For 150 nb pipe and 100 nb 600 flange rating spacing 255 mm.
For fiber reinforced plastic pipe frp support spacing in liquid service would vary from around 11 ft for 2 pipe to 22 ft for 8 pipe.
The spacing between the 2 lines 255 mm.
Chimney and vent are near the ridge peak of the roof.